ECO AFS - Alternative Fuel Systems Johnson Matthey Master Distributor for MN, IA & SD Photo Gallery About Us Contact Us
Home GTI-BiFuel System Products Services Case Studies FAQ Economic Analysis Literature Dealers
Operate your Diesel Engine on Natural Gas and Save
BiFuel
Installation

The GTI Bi-Fuel System is installed by trained technicians, normally taking anywhere from a few hours to a few days depending on the size of the generator. During nearly all of the installation process, the generator can be utilized for emergency power with little or no starting delay if the system is applied at the customer’s job site. Actual downtime of the generator is limited to only a few minutes, and rental back-up power is normally not required during installation of the system.

After installation of the GTI Bi-Fuel System hardware, the generator is then operated under various load settings (normally with the use of a resistive load bank) while the system is checked and calibrated. After this “tune-in” process is completed, the generator is fully tested in Bi-Fuel mode to assure proper operation of the Bi-Fuel System and generator during light, medium, heavy and transient loads. Finally, the generator is tested in 100% diesel mode to verify that its 100% diesel performance has not been affected by installation of the Bi-Fuel System.

© 2018 ECO AFS site by Dawa